Any Tier-1 (General) new applicants??

Archived UK Tier 1 (General) points system forum. This route no longer exists.

Moderators: Casa, Amber, archigabe, batleykhan, ca.funke, ChetanOjha, EUsmileWEallsmile, JAJ, John, Obie, push, geriatrix, vinny, CR001, zimba, meself2, Administrator

Locked
chakde23
Member
Posts: 174
Joined: Tue Mar 04, 2008 2:21 pm

Post by chakde23 » Tue Jun 03, 2008 5:23 pm

you are right , i am fine waiting till next weekend but atleast its not in queue to be assigned to CW ....I expected delays, hence i have planned it with sufficient time on hand....anyway lets hope these delays dont affect those who really cant afford !
kmore97 wrote:Chakde,
given that a CW started working on ur application just frm yesterday, it may take upto end of next week for u to receive ur docs back after stamping. That's like 1 month and 2 weeks and soon it may be 7-8 weeks to complete a straight forward case. It's really to long a period to hold the passport by HO.

chakde23 wrote:Hi Cooldepps,

I guess suggesting 50 days time period is now quite common as i too was told 50 days when i called last wednesday. We both have apparently applied on same date 29th april . I was too dejected when i heard 50 days & particularly when he told me its still not assigned to a caseworker ........but to my surprise i got a phone call from home office yesterday early morning by caseworker asking for page 34 to be signed and sent back to him by email . He told he has started to work on my case yesterday - which was good to hear !

I am sure your case also will be taken this week , just hang on and try calling them on friday or monday - i am sure you should hear positive update

cooldepps
Junior Member
Posts: 52
Joined: Wed Apr 30, 2008 8:31 pm

Post by cooldepps » Tue Jun 03, 2008 5:24 pm

HI Chakde23,

Frankly speaking I dont even remember it since it was filled by my consultant and I just checked whether the details entered by her is correct or not. :(
And I didnt had time to scan or take copies of the application too. Hope it must be filled properly by my consultant.

Cheerz,
cooldepps
chakde23 wrote:did you tick section AA1 ( public funds ) ? i missed it since it was at bottom of page 34 ( not for WP to tier 1 )

cooldepps wrote:Hi chakde23,

Yeah I will wait till Friday and call them back if I dont hear anything from them till then. Best of luck to you too.

Cheerz,
cooldepps

chakde23
Member
Posts: 174
Joined: Tue Mar 04, 2008 2:21 pm

Post by chakde23 » Tue Jun 03, 2008 5:27 pm

in that case, check with your consultant if they have heard from Home Office for sending Page 34 , it might cause delay in processing bcoz i had seen someone on this board who was sent letter by post which took ages to inform that page 34 was not ticked !

cooldepps wrote:HI Chakde23,

Frankly speaking I dont even remember it since it was filled by my consultant and I just checked whether the details entered by her is correct or not. :(
And I didnt had time to scan or take copies of the application too. Hope it must be filled properly by my consultant.

Cheerz,
cooldepps
chakde23 wrote:did you tick section AA1 ( public funds ) ? i missed it since it was at bottom of page 34 ( not for WP to tier 1 )

cooldepps wrote:Hi chakde23,

Yeah I will wait till Friday and call them back if I dont hear anything from them till then. Best of luck to you too.

Cheerz,
cooldepps

cooldepps
Junior Member
Posts: 52
Joined: Wed Apr 30, 2008 8:31 pm

Post by cooldepps » Tue Jun 03, 2008 5:31 pm

Is it necessary for WP to Tier1 type application since I come under that category?
chakde23 wrote:in that case, check with your consultant if they have heard from Home Office for sending Page 34 , it might cause delay in processing bcoz i had seen someone on this board who was sent letter by post which took ages to inform that page 34 was not ticked !

cooldepps wrote:HI Chakde23,

Frankly speaking I dont even remember it since it was filled by my consultant and I just checked whether the details entered by her is correct or not. :(
And I didnt had time to scan or take copies of the application too. Hope it must be filled properly by my consultant.

Cheerz,
cooldepps
chakde23 wrote:did you tick section AA1 ( public funds ) ? i missed it since it was at bottom of page 34 ( not for WP to tier 1 )

cooldepps wrote:Hi chakde23,

Yeah I will wait till Friday and call them back if I dont hear anything from them till then. Best of luck to you too.

Cheerz,
cooldepps

chakde23
Member
Posts: 174
Joined: Tue Mar 04, 2008 2:21 pm

Post by chakde23 » Tue Jun 03, 2008 5:44 pm

i am also switching from WP to Tier 1 & I too assumed its not for us ...but if you look at Section AA - it says to be completed by ALL .... its too easy to miss out , but I guess since you have applied through consultant they would be rather aware.....

The reason i said to check with your consultant is to make sure if this is not a reason for any delay for your case yet not with a CW....I dont really want to drive you crazy but on safer side just ask your consultant if they have completed sectionn AA1 ...if yes,then you have one less thing to worry !!!

I was also suprised when i was told yesterday by CW that it needs to be completed by ALL ! which is true if you look at page 34 !
cooldepps wrote:Is it necessary for WP to Tier1 type application since I come under that category?
chakde23 wrote:in that case, check with your consultant if they have heard from Home Office for sending Page 34 , it might cause delay in processing bcoz i had seen someone on this board who was sent letter by post which took ages to inform that page 34 was not ticked !

cooldepps wrote:HI Chakde23,

Frankly speaking I dont even remember it since it was filled by my consultant and I just checked whether the details entered by her is correct or not. :(
And I didnt had time to scan or take copies of the application too. Hope it must be filled properly by my consultant.

Cheerz,
cooldepps
chakde23 wrote:did you tick section AA1 ( public funds ) ? i missed it since it was at bottom of page 34 ( not for WP to tier 1 )


headley
Junior Member
Posts: 54
Joined: Wed May 28, 2008 2:45 pm

Post by headley » Tue Jun 03, 2008 6:51 pm

HI All,

Congrats to Shiva!!!!! :D :D :D :D :D :D :D :D :D


I am still waiting like the rest of you.


Hope tomorrow is a good day for the rest of us!!!!!!!!!


headley

kmore97
Member
Posts: 156
Joined: Sun Oct 07, 2007 1:38 am

Re: Applied before 30th April - Decision made

Post by kmore97 » Tue Jun 03, 2008 8:28 pm

Last week, they updated their site saying
Business and Commercial:

Straight forward applications (including Tier 1's) between 9 May 2008 and 13 May 2008. All other applications between 30 April 2008 and 6 May 2008.


This week it is updated as

Business and Commercial

Straight forward applications (including Tier 1's) between 16 May 2008 and 21 May 2008. All other applications between 1 May 2008 and 7 May 2008.


Notice the overlap between 2 weeks updates

30 April 2008 and 6 May 2008
and
1 May 2008 and 7 May 2008
kmore97 wrote:Please see below the text taken from HO web site.

Business and Commercial:

Straight forward applications (including Tier 1's) between 9 May 2008 and 13 May 2008. All other applications between 30 April 2008 and 6 May 2008.


Is it ok to assume from this, all apllications made before 30th april are decided already - just waiting for stamping?

vipul1981
Senior Member
Posts: 593
Joined: Fri Mar 07, 2008 11:21 am
Location: UK

Post by vipul1981 » Tue Jun 03, 2008 8:51 pm

kmore
what overlap are u talking about?

hussainkothari
Member of Standing
Posts: 444
Joined: Mon Aug 07, 2006 3:33 pm
Location: UK

Post by hussainkothari » Tue Jun 03, 2008 9:34 pm

The difference after one week is applications of one day only.
Guys, I am from WP -> T1. Is mine a "Straight forward applications" ?

-H
vipul1981 wrote:kmore
what overlap are u talking about?

vipul1981
Senior Member
Posts: 593
Joined: Fri Mar 07, 2008 11:21 am
Location: UK

Post by vipul1981 » Tue Jun 03, 2008 10:04 pm

guys, you have been missed out one of my post. it just means that the applications recd during these days are being assgned to case workers. further to clarify this, it means its been asigned a case worker and doesnt mean that case worker is working on it. so considering the backlog, they have just assigned it

vipul1981
Senior Member
Posts: 593
Joined: Fri Mar 07, 2008 11:21 am
Location: UK

Post by vipul1981 » Tue Jun 03, 2008 10:10 pm

hussein, when did u apply. 7th rite? are u on trackitt as well?

vipul1981
Senior Member
Posts: 593
Joined: Fri Mar 07, 2008 11:21 am
Location: UK

Post by vipul1981 » Tue Jun 03, 2008 10:12 pm

can somebody update the list please

hussainkothari
Member of Standing
Posts: 444
Joined: Mon Aug 07, 2006 3:33 pm
Location: UK

Post by hussainkothari » Tue Jun 03, 2008 10:13 pm

Applied on 7th, reached the HO on 8th. On trackitt at
www.spammer.com/uk-immigration- ... extension/

So is my app a "Straight forward applications"
vipul1981 wrote:hussein, when did u apply. 7th rite? are u on trackitt as well?

vipul1981
Senior Member
Posts: 593
Joined: Fri Mar 07, 2008 11:21 am
Location: UK

Post by vipul1981 » Tue Jun 03, 2008 10:16 pm

hussain
i think it is. i think what they mean by strt frwrd is that they dont have to do any enquiry.
so i think that will depend on ur documents

vipul1981
Senior Member
Posts: 593
Joined: Fri Mar 07, 2008 11:21 am
Location: UK

Post by vipul1981 » Tue Jun 03, 2008 10:19 pm

i am going to ask a question, which i asked before.

i am on HSMP and have applied for extension. Can HO also go for verification of previous employer at time of application of old HSMP. The reason for my concern is, that if they can do, i want to call up my 5 years old employer back in India, to let them know that somebody can call up. i m not even sure, if there is anybody, who stil knows me.

Please suggest

hussainkothari
Member of Standing
Posts: 444
Joined: Mon Aug 07, 2006 3:33 pm
Location: UK

Post by hussainkothari » Tue Jun 03, 2008 10:59 pm

Updated list as on 03/6/2008

March list
=======

http://www.immigrationboards.com/viewto ... 511#170511

Tier1Hsmp :D
-------------------------
Type of application : WP to TIER1
Application Sent : 25/3/2008
Payment taken : 04/4/2008
Ref no dated : 04/4/2008
Ref number : NA
Status : Approved
Stamped on : 29/4/2008
Recevied on : 07/5/2008
Days taken : 33days

Cisman :?:
-------------------------
Type of application : WP to TIER1
Application Sent : 29/3/2008
Payment taken : 31/3/2008
Ref no dated : 31/3/2008
Ref number : NA
Status : Pending
Stamped on :
Recevied on :
Days taken :

April list
=========

77 :?:
-------------------------
Type of application : WP to Tier 1 (with hsmp approval letter)
Application Sent : 01/4/2008
Payment taken : 02/4/2008
Ref no dated : 02/04/2008
Ref number : PB30****
Recd email from HO wanting another set of photos as not clear on 14/05/2008. 15/05 sent new set of photos
Decision: still waiting??

Amitgoyal :D
-------------------------
Type of application : WP to TIER1
Application Sent : 01/4/2008
Payment taken : 03/4/2008
Ref no dated : 03/4/2008
Ref number : PB3014**
Status : Approved
Stamped on : NA
Recevied on : 21/4/2008
Days taken : 17days

Twinkle :D
-------------------------
Application sent : 2/4/2008
Status : Approved
Received on : 30/4/2008
Days Taken : 28 days.


mg :D
-------------------------
Date of application: 2/4/08.
Payment date : 9/4/08.
Status : Approved.
Docs received : 13/5/2008
Days taken : 34 days

nibbs: :D
-------------------------
Application sent : 4/4/08
fees deducted : 7/4/08
reference no : 7/4/08
passport stamped : 28/4/08
docu+pp recieved :- 3/5/2008 - by special delivery post
Days taken : 26 days

Junior :D
-------------------------
Apps Type: HSMP extension under Tier1(general)
Date applied: 05 April 08 (Recorded delivery first class)
Received at HO: 07 April 08
Payment processed: 08 April 08
Decesion made: 02 May 08
Endorsemnet date: 12 May 08
Docs return date: 16 May 08

SKris: :D
-------------------------
Applied - 7th April
Fees deducted - 8th April
Ref number received - 10th April
Approval date - 29th April (as indicated in the HO letter)
Docs received - 7th May

emacmac :?:
-------------------------
Status: HSMP to Tier 1
Applied:7th April (claiming 105 points)
Received at HO: 8th April
Payment taken: 8th April
Ref number received: 9th April (PB/3020)
Received documents: waiting
Approval letter: waiting
Passport stamped: waiting
His case has been put on hold due to the new court ruling on HSMP as told by HO

fardeen: :D
-------------------------
From WP to Tier1
Applied: April 7th (Royal mail special delivery)
Recd at Home Office: April 8th (confirmed)
Payment Processed: April 8th
Reference no: April 8th PB3020***(sent on 8th by post)
Decision: Approved
Stamped: May 1st 2008
Docs: special delivery 8th may (they left a card yesterday)

Sansui :?:
-------------------------
Type of application : WP to Tier 1 with valid HSMP letter
Application Sent : 07/4/2008
Payment taken : 08/4/2008
Ref no dated : 10/04/2008
Ref number : PB3020**
Status : awaiting

WP2Tier1 :D
-------------------------
Applied:5th April
Received at HO: 8th April
Payment taken: 8th April
Ref number received: 10th April
Called HO on 28th April and they told Its waiting to be assigned to case worker
Called HO again on 6th May and they told its under consideration and with case worker.
Called HO again on 7th and they told documents despatched on 6th.
Received documents on 7th May.
Approval letter dated 28th April
Passport stamped 28th April(for myself and spouse)
Validity till 28th April 2011
No of days taken :29 days

Mrs.Fardeen :D
-------------------------
Type of application: Student to TIER 1
Application Sent: 08/4/2008 (royal mail special delivery)
Payment taken: 09/4/2008
Ref no dated: 09/4/2008
Status: Approved
Stamped on: will need to check
Received on: 24/5/2008

Smartboy_uk: :D
-------------------------
Date Applied:8th April
Payment Taken: 9th April
Reference Number Received: 10th April (PB302**)
Decision : Approved
Passport stamped: 13th May
Docs recvd: 16th May

Vora :D
-------------------------
Type: IGS to Tier1
Applied: 9th April
Recvd: 10th April
Ref Issued: 10th April
Called Homoffice on : 12th May, "under consideration" was the response
Called Homoffice on : 14th May, "under consideration" same as before
Approval date : 7th May
Passport stamped: 14th May
Docs recvd: 17th May

rashsmp: :D
-------------------------
Applied: April 9th (For Tier1 with valid HSMP approval Letter)
Recieved at Home Office: April 10th
Payment Processed: April 10th
Reference no: April 12th(lettter dated 10th) -PB3022****
Decision: Approved
Stamped: May 6th 2008
Docs received - 8th May 2008.

Kinta :D
-------------------------
of application: WP to Tier 1
Application sent: 11/04/08
Reference number PB302XXXX dated 14/04/2008
Stamped on: 15/05/2008
Received on 21/05/2008

Sidshekhar:( Work Permit to Tier1) :D
-------------------------
Applied: 11th April
Received at Home Office: 14th April
Payment Taken:18th April (Cheque Payment)
Reference Number Issued:21st April
Called home office on 19th May. They said its "under consideration".
Decision:Approved 16th May
Passport Stamped: 21st May
Valid Till: May’ 2011
Documents Received:28th May
Other Info: Applied through solicitor

Krishna186 :D
-------------------------
Date Applied: 11th April
Doc recvd at HO & payment processed: 14th April
Reference Number Received: 17th April
Decision made & Passport stamped : 14th May
doc sent from HO: 16th May
Documents received: 17th May (special delivery next day 1PM delivery)
Ref No: PB302***

Abhishekagarwal :D
-------------------------
Applied : 12th April
Payment taken: 14th April
Ref number received: 16th April
Received documents on 16th May.
Approval details I'll post once I reach home. I havn't seen the docs yet.

Zella29 :D
-------------------------
Type of application : WP to TIER 1
Application Sent : 12/4/2008
Payment taken : 15/4/2008
Ref no dated : 16/4/2008
Ref number : PB302XXXXXX
Status : Approved
Stamped on : 19/05/2008
Recevied on : 29/05/2008
Days taken : 47 days

SR1992:(HSMP to Tier1) :D
-------------------------
Applied: 14th April (Royal Mail Special Delivery)
Received: 15th April
Payment Taken: 15th April (Postal orders)
Reference Number: PB30270XXXXXX/001 dated April 15.
Called for update 14th May, was advised a decision was made May 13.
Decision: Approved, stamped May 13,
Docs Received: May 19 (Special Delivery - sent with application) Applied: 14th April (Royal Mail Special Delivery)

Apaswat :D
-------------------------
Application Sent : 14 April 2008
Application Received : 15 April 2008
Payment Processed : 15 April 2008
Reference no. Allocated : 15 April 2008
Reference no. Received : 16 April 2008 (.....)
Decision :Approved
Documents received on 21/5/2008.

Linuxman2k3: :D
-------------------------
Date Applied:14th April
Payment Taken: 15th April
Reference Number Received: 17th April (PB302**)
Decision : 6th May
Stamped: 6th May
Documents received: 16th May

kanaparthyprasad :?:
-------------------------
Applied: 14th April
Received: 15th April
Payment Taken: 15th April
Reference Number: PB30270XXXXXX/001 on April 15.
Decision: Phoned on 09/05/2008 and told applciation waiting to be allocated to case worker and cannot say when it will be allcoated.
Waiting
Documents Received: Waiting

shachit :D
-------------------------
1) Application received - 15/04/2008
2) Money taken from A/C - 17/04/2008
3) Reference # received - 15/04/2008
4) Queries to employer from HO - 06/05/2008
5) Allocated to Case worker - 08/05/2008
6) Approved - 08/05/2008
7) Received documents - 24/05/2008

shravan_krish :D
-------------------------
Applied on: 15th Apr 08
Fee Debited: 17th Apr 08
AppRef: PB3028****
Approved on:14th May 08 (as on letter)
Stamped on: 28th May 08 (as on stamping)
Docs Receieved: 31 May 08
Note: I forget to declare the public funds section for which they sent me back that particular page and which took an additional weeks time or otherwise I should have got it much earlier.

alpharulez: :D
-------------------------
From WP to Tier1
Applied: April 16th (Royal mail special delivery)
Recvd at Home Office: April 17th
Payment Processed: April 17th
Reference no: April 19th
Decision: May 16th
Stamping: May 16th
Documents posted: May 28th (Royal mail recorded delivery)
Documents recevied: May 29th

Sankar :D
-------------------------
Date Applied: 16th April
Doc recvd at HO & payment processed: 17th April
Reference Number Received: 19th April
Decision made & Passport stamped : 6th May
doc sent from HO: 16th May
Documents received: 17th May (special delivery next day 1PM delivery)

Blue.olive :D
-------------------------
From WP to Tier1
Applied: April 17th (Royal mail special delivery)
Recd at Home Office: April 18th (confirmed)
Payment Processed: April 18th
Reference no: April 18th PB3030***(sent on 18th by post)
Decision: 13th May 2008 ( Passport stamped )
Doc received : 17th May 2008
Points awarded : 75

Soni123 :?:
-------------------------
Type of application : Student visa ,with aproval to Tier 1
Application Sent : 17/4/2008
Payment taken : 18/4/2008
Ref no dated : 21/4/2008
Ref number : PB302**
Status : Waiting...
Stamped on : ?
Recevied on : ?
Days taken :

venkmano: :?:
-------------------------
Applied: April 18th for Tier1
Recieved at Home Office:
Payment Processed: April 18th
Location: Chennai
Reference no: April 18th
Decision: Awaited

Andynaggers :D
-------------------------
Applied: 21st April (WP to Tier1 in UK) along with a Return by Special Delivery 9AM envelope.
Received: 24th May
Date Approved: 20th May and VISA valid till May 2011.

Boonworkpermit :D
-------------------------
Type of application: WP->Tier1 with an HSMP approval letter
Application sent: 21/04/08
Reference number PB3034XXX dated: 22/04/08
FLR stamped on: 16/05/08
Received all documents back on: 21/05/08.

Misona :D
-------------------------
Type of application: WP->Tier1
Application sent: 21.04.08
Reference number : 22.04.08
Approval letter dated: 15.05.08
Visa stamped: 16.05.08
Received all documents back on: 22.05.08

birmiboy :D
-------------------------
Applied on : April 21st
Payment on : April 22nd
Reference no : April 24th.
Decision on : May 20th
Received all document : May 28th.
Passport stamped till May 20th 2011

micabyte :D
-------------------------
Type of application : WP to TIER 1
Application Sent : 21/4/2008
Payment taken : 23/4/2008
Ref no dated : 24/4/2008
Ref number : PB3036XXXXX/001
Status : Approved
Stamped on : 22/5/2008
Recevied on : 28/5/2008
Days taken : 36 days

shivaa :D
-------------------------
Applied on 22apr2008
Decision : Approved
Received :june 3
Points claimed :85
Awarded:85

Anilhemnani :?:
-------------------------
Type of application: WP->Tier1
Application Sent : 22nd April 2008
Application Received : 23rd April 2008
Payment Processed : 24th April 2008
Reference no. Allocated : 24th April 2008
Reference no. Received : 26th April 2008 (.....)
Decision : Awaiting

fergronin :D
-------------------------
Credit card charged: 23-Apr-08
Reference Number received by post: 23-Apr-08(date on letter)
Status Update on 21-May-05: "Application is in checking stages and can hear something by end of this week or early next week
Passport Stamped:Done
Documents received :03-Jun-08
Decision : Approved

taniabee :D
-------------------------
Type of application : HSMP extension to TIER1
Application Sent : 23/4/2008
Payment taken : 25/4/2008
Ref no dated : 25/4/2008
Ref number : PB3037***
Status : Approved
Stamped on : 29/05/2008
Recevied on : 03/06/2008
Days taken : 35 days

jessica_halida :?:
-------------------------
Applied from UK( HSMP to Tier 1)
Applied on: April 23
Payment on: April 28
Ref. Letter received: April 24
Decision on: ??
Documents received on: ??

Anxiouswait :D
-------------------------
Application sent: 24/04/2008
Application Received: 25/04/2008
Payment Taken: 25/04/2008
Acknowledgement Received: 26/04/2008
Approved: 23/05/2008
Passport Stamped: 27/05/2008
Documents Received: 29/05/2008

LifeIsStruggle :D
-------------------------
Type of application : SEGS to Tier 1
Application Sent : 24/4/2008
Payment taken : 25/4/2008
Ref no dated : 25/04/2008
Ref number : PB30****
Decision: approved
Received:2/6/2008

k_V :D
-------------------------
Applied from UK( WP to Tier 1 with valid approval letter )
Applied on: April 24
Payment on: April 28
Ref. Letter received: April 28
Decision : Approved
Documents received on: 31/5/2008

Ankur9M :D
-------------------------
Type of application: WP to TIER 1
Application Sent: 24/04/2008
Payment taken: 25/04/2008
Ref no dated: 25/04/2008
Status: Approved
Stamped on: 27/05/2008
Received on: 31/05/2008
Letter dated: 23 May 2008

Beever :?:
-------------------------
Doc sent by agent: 28 April (claiming 90 points)
Received at HO: 29 April
Payment debited: 1 May
Letter w. reference no. dated: 30 April, letter received 6 May
Ref number: PB3042 0149**/***
Decision: Awaiting

coldepps :?:
-------------------------
Type of application : WP to TIER 1
Application Sent (thru Consultant): 28/4/2008
Ref no dated : 29/4/2008
Ref number : PB3037XXXXX/001
Status :
Stamped on :
Recevied on :

Chakde :?:
-------------------------
Applied from UK( WP to Tier 1 -Initial Application )
Applied on: April 29
Payment on: May 01
Ref. Letter received: May 2 ( letter dated 30th April)
Phone call from home office : June 2 - to email Section AA1
Decision on :
Documents received on:

headley in UK :?:
-------------------------
WP to Tier 1 with approval letter
Applied on: April 29
Payment on: April 30
Ref. Letter on: received May 6 (but dated April 30)
Decision on: waiting
Documents on: still waiting

May list
=======

Kmore97 :?:
-------------------------
Applied (by Special Delivery): 1-May-08
Received by HO: 2-May-08
Ref. No. Allocated: 2-May-08
Payment Processed: 6-May-08 (as per credit card statement)
Ref No. Received (by Post): 8-May-08


Vipul 1981 :?:
-------------------------
Date Applied: 6th May 2008
Ref No: allocated
Date Recd: 10th may
Decision: AWAITED
Documents Recd: AWAITED

hussainkothari :?:
-------------------------
Switching from WP to Tier1
Applied (by Special Delivery): 7-May-08
Received by HO: 8-May-08
Ref. No. Allocated: Letter dated 8th May
Ref. No. Letter Received: 12-may-08
Payment Processed (Called the credit card office to find out) : 8-May-08

Lokesh(WP to Tier-1): :?:
-------------------------
Date Applied:8th May
Payment Taken: 9th May
Reference Number Received: 12th May (PB305**)
Decision : Awaited
Stamped: Awaited
Documents received: Awaited

Nervoustimes :?:
-------------------------
Type of application : WP to TIER 1
Application Sent : 11/05/2008
Payment taken : 12/05/2008
Ref no dated : 13/05/2008
Ref number : PB305**
Status : Pending
Stamped on :
Recevied on :
Days taken :
Comments :

lovnishs :?:
-------------------------
Date Applied :12th May
Reached Home office : 13th May
Debit charged: 13/5/2008
Reference Number received :14/5/2008
Approval Date: Awaiting
Docs Received: Awaiting

aamirmalik :?:
-------------------------
Date Applied:15 May
Payment Taken: 16/5/2008
Reference Number Received: 19/5/2008
Decision : Awaited
Stamped: Awaited
Documents received: Awaited

nauyf :!:
-------------------------
Type of application : Student visa to Tier 1
Application Sent : 15/5/2008
Payment taken : 16/5/2008
Ref no dated : 19/5/2008
Ref number : PB305**
Status : Waiting...
Stamped on : ?
Recevied on : ?
Days taken :[/quote]

rajivferroin: :?:
-------------------------
Applied via special delivery from UK(HSMP to Tier 1)
Applied on: May 30
Ref Letter dated: May 30
Ref. Letter received: June 2
Payment on:
Decision on:
Documents received on:

Mannu: :?:
-------------------------
Applied via special delivery from UK( WP to Tier 1)
Applied on: May 30
Ref Letter dated: May 30
Ref. Letter received: June 2
Payment on:
Decision on:
Documents received on:

hussainkothari
Member of Standing
Posts: 444
Joined: Mon Aug 07, 2006 3:33 pm
Location: UK

Post by hussainkothari » Tue Jun 03, 2008 11:03 pm

Hi All,

I have updated the list. I would maintain this until I receive my papers. Shivaa, hope you would not mind. Others, please review your details and leave me a message in case any changes are required.

I will update this list daily in the late evening.

-H

rahsmp
Junior Member
Posts: 61
Joined: Tue Apr 15, 2008 10:35 pm

Post by rahsmp » Wed Jun 04, 2008 9:46 am

I am posting a time lines of my friend whos Tier1 Application got rejected.
Name Ana:
Type of application : WP to TIER1
Application Sent : 28/4/2008
Payment taken : 29/4/2008
Ref no dated : 29/4/2008
Ref number: PB 304****
Status : Rejected
Recevied on : 03/6/2008



hussainkothari wrote:Hi All,

I have updated the list. I would maintain this until I receive my papers. Shivaa, hope you would not mind. Others, please review your details and leave me a message in case any changes are required.

I will update this list daily in the late evening.

-H

jessica_halida
Junior Member
Posts: 91
Joined: Sat May 24, 2008 1:05 pm

Post by jessica_halida » Wed Jun 04, 2008 9:48 am

rahsmp wrote:I am posting a time lines of my friend whos Tier1 Application got rejected.
Name Ana:
Type of application : WP to TIER1
Application Sent : 28/4/2008
Payment taken : 29/4/2008
Ref no dated : 29/4/2008
Ref number: PB 304****
Status : Rejected
Recevied on : 03/6/2008
Oh dear, so sorry to hear that.
Any clue of reason for rejection?

nitmech
Junior Member
Posts: 55
Joined: Thu May 08, 2008 5:54 am
Location: Mumbai
Contact:

Post by nitmech » Wed Jun 04, 2008 9:51 am

Hi guys,

I applied for tier 1 today.

cooldepps
Junior Member
Posts: 52
Joined: Wed Apr 30, 2008 8:31 pm

Post by cooldepps » Wed Jun 04, 2008 9:56 am

Hi rahsmp,

Really sorry to hear that news...To wait for so long and hear such news is very disheartening.... :cry:
What was the reason for rejection???

Cooldepps.

[quote="rahsmp"]I am posting a time lines of my friend whos Tier1 Application got rejected.
Name Ana:
Type of application : WP to TIER1
Application Sent : 28/4/2008
Payment taken : 29/4/2008
Ref no dated : 29/4/2008
Ref number: PB 304****
Status : Rejected
Recevied on : 03/6/2008

jessica_halida
Junior Member
Posts: 91
Joined: Sat May 24, 2008 1:05 pm

Post by jessica_halida » Wed Jun 04, 2008 9:59 am

nitmech wrote:Hi guys,

I applied for tier 1 today.
Hello, is what you mean is 4th June and not 4th May?

chakde23
Member
Posts: 174
Joined: Tue Mar 04, 2008 2:21 pm

Post by chakde23 » Wed Jun 04, 2008 10:19 am

very sad to hear, can you please let us all know reason for rejection
rahsmp wrote:I am posting a time lines of my friend whos Tier1 Application got rejected.
Name Ana:
Type of application : WP to TIER1
Application Sent : 28/4/2008
Payment taken : 29/4/2008
Ref no dated : 29/4/2008
Ref number: PB 304****
Status : Rejected
Recevied on : 03/6/2008



hussainkothari wrote:Hi All,

I have updated the list. I would maintain this until I receive my papers. Shivaa, hope you would not mind. Others, please review your details and leave me a message in case any changes are required.

I will update this list daily in the late evening.

-H

anilhemnani
Newbie
Posts: 49
Joined: Sun Apr 20, 2008 1:50 am
Contact:

Post by anilhemnani » Wed Jun 04, 2008 10:27 am

Ohh man.. Sorry to read about that rejection.. So the theory of rejections happen at earlier stage in 2-3 weeks is false... Nothing is sure untill and unless you get the documents back in hand..

rahsmp
Junior Member
Posts: 61
Joined: Tue Apr 15, 2008 10:35 pm

Post by rahsmp » Wed Jun 04, 2008 10:43 am

I have given the reson for rejection in the following thread.
http://www.immigrationboards.com/viewtopic.php?t=27284

As per my knowledge there are several stages the application will go thorugh
1. Payment
2. Verification of all the required/supporting documents
3. Verifying with sources if required.
above will happen in 2-3 weeks
4. Case worker start looking at the application
4a. Check the application and clarify with the applicant if any issues.
4b. Asses the point claimed .
4c . Decision on the application.
5. If Rejected send it back or If approved then send it for Stamping.
6. Passport verification
7. Stamping and sedning it back.

My friend case has failed in stage 4b.

-Ra

anilhemnani wrote:Ohh man.. Sorry to read about that rejection.. So the theory of rejections happen at earlier stage in 2-3 weeks is false... Nothing is sure untill and unless you get the documents back in hand..

Locked